Hyperion

PTS working with Techcom International and the City of Los Angeles to repair their 1 mile outfall for the Hyperion Treatment plant. The project is going and on schedule. This has been a textbook example of a working project, on time and on budget.

Navy’s Sea Hunter

Pacific Tugboat Service is the go to contractor for the Navy on the Pacific Ocean, we have the largest floating commercial crane on the West Coast of the United States, and have been deeply involved in the design, transportation, and support for the Navy’s newest UUV, the Sea Hunter.

San Diego Red Bull Race 2017

The Red Bull Air Race World Championship makes a welcome return to San Diego on the 15-16 April 2017. Set on the Pacific coast of California the location provides the perfect backdrop for a race. San Diego last hosted a Red Bull Air Race back in 2009 and proved extremely popular with the fans that…

Ports to power a new kind of cleaning crew

A new war on air pollution in the twin seaports of Los Angeles and Long Beach is about to be launched. An armada of pelican-shaped barges with 100-foot-tall towers and booms could soon be navigating the ports, connecting their sleeves of ductwork to smokestacks of berthed container ships, and vacuuming out an alphabet soup of…